Bored pier inspection in Morayfield

Depth, diameter and a clean base, checked while every hole is still open.

  • After piers are formed, before concreting
  • About 1 hour on site
  • Report within 24 hours
Get a quoteWe’ll send a quote to your inbox once we have your details

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookAfter piers are formed, before concreting
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Morayfield bored piers inspection

  • Pier diameter matches the engineer's design
  • Depth measured from the collar to the footing
  • Reinforcement cage centred within the pier
  • Side cover against the formwork
  • Bottom cover at the footing level
  • Screw piers checked for level
  • Hole cleaned of loose soil before pour
  • Cage tied off to avoid displacement
  • Height of the pier wall noted
  • Access for concrete pump or bucket
  • Reinforcement lap lengths correct
  • Sleeve positioning for anchor bolts
Why it matters here

Bored piers inspections on Morayfield builds

Piers come into Morayfield builds where a footing has to reach past fill or soft ground to the material the engineer designed for, and some lots use screw piers instead. On the one Morayfield pier job in our records the screw piers were set out where the engineering showed them. The common failings elsewhere in the north are bases left full of loose spoil and holes still being drilled when the concrete was due.

What we find at this stage in Morayfield

  • Soil or builder materials remaining at the bottom of the excavation
  • Piers poured behind schedule
  • Short of the engineering drawings.
  • Morayfield building inspections
  • Inspect foundation details against drawings
Depth of piers type 1, recorded during a bored pier inspection in Freshwater
Bored piers must be dug 1000mm into stiff clay, but the depth varies between 1200mm and 1700mm, Freshwater
Sample findings

Sample defects found during our bored piers inspections in Morayfield

Annotated findings from Bored piers inspections.

Depth of piers type 2, recorded during a bored pier inspection in Gisborne
The bored piers vary between 700mm and 1100mm deep according to engineering requirements, Gisborne
Depth slightly borderline, recorded during a bored pier inspection in Wantirna
The pier depth was slightly borderline because the starting point was hard to determine, but the variation was minor, Wantirna
Depth of piers type 2, recorded during a bored pier inspection in Gisborne
The piers vary between 700mm and 1100mm deep and are dug at least 300mm into stiff clay, Gisborne
Depth of piers type 2, recorded during a bored pier inspection in Gisborne
Bored piers vary in depth from 700mm to 1100mm and are dug at least 300mm into stiff clay as required, Gisborne

The other stages of a Morayfield build

  1. Slab pre-pour inspection in Morayfield2Slab pre-pourThe day before the pour, after reo is set
  2. Frame inspection in Morayfield3FrameFrame and trusses standing, roof on, before linings
  3. Lock-up (pre-plaster) inspection in Morayfield4Lock-up (pre-plaster)Cladding on, windows in, before plaster
  4. Fixing inspection in Morayfield5FixingJoinery and doors in, before painting
  5. Waterproofing inspection in Morayfield6WaterproofingMembrane set, before the tiler starts
  6. Pre-handover (PCI) inspection in Morayfield7Pre-handover (PCI)Pre-handover inspection checklist

All construction stage inspections in Morayfield →

Guides

Construction stage guides for Morayfield

All guides →

Book a bored piers inspection in Morayfield

Instant online pricing for Morayfield, or contact the booking team.

FAQ

Bored piers inspections in Morayfield: common questions

How much time does a pier visit need on a Morayfield lot?

It takes about an hour for most blocks, and longer if the site has many piers or deep holes.

How are screw piers inspected?

We verify the location of each fixture against the installers log, rather than opening up the walls to look inside.

How do I clean the slab base?

Loose ground settles under house weight. Foundations must sit on stable ground, not loose fill.

Which papers should a Morayfield owner send first?

We check excavation depths and post positions against the engineering drawings and soil reports.

Are the piers completed?

We mark any incomplete works so the builder can fix them. A partial inspection leaves too much to guess work.

Do you issue certificates for the building work?

No. Principal Certifier Inspections Issue Certificates. We record all our findings for you.

Get a Free Quote